DATA CENTER
QTS Excalibur
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
All Projects
ACTIVE
Under Construction
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
INVESTMENT
$1B+
CAPACITY
400+ MW
SCALE
6.6M SF
LOCATION
Fayetteville
DEVELOPER
QTS (Blackstone)
GC
Clayco / HITT
Interested in this market?
Bolt Contracting builds the civil, structural, and power infrastructure for projects like this across the Southeast.