CORE CAPABILITY

Steel Erection & Metal Buildings

Steel erection is the scope that defines a building's structural skeleton -- and the one where schedule recovery is impossible once you fall behind. We self-perform structural steel and pre-engineered metal building erection with our own crews and equipment because the coordination between foundation work, steel delivery, and erection sequencing must be seamless.

500K+SF Steel Capacity
CAPABILITIES

What we deliver.

Pre-engineered metal buildings

Complete PEMB systems from design coordination through erection -- including primary and secondary framing, wall and roof panels, trim, and accessories.

Structural steel erection

Hot-rolled structural steel framing for industrial, commercial, and mission-critical facilities. Crane-erected to AISC tolerances.

Steel framing systems

Light gauge and structural steel framing for mezzanines, platforms, equipment supports, and canopy structures.

Metal roof & wall systems

Standing seam metal roofing, insulated metal panels, and composite wall systems.

Mezzanine installation

Structural steel mezzanine platforms for warehouses, manufacturing floors, and equipment areas.

Crane-served buildings

Steel structures designed for overhead bridge cranes -- including crane rails, runway beams, columns, and building envelope.

RELATED PROJECTS

Projects in this market.

Data Center$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Manufacturing$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Industrial$500M+

Cubes at Bridgeport

Newnan

Mega industrial park at I-85 Exit 41. Amazon 1M SF tenant. Scout Cold Logistics. Approximately 6M SF of development remaining.

Tell us what you're building.

No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.