Data Centers
Data center sitework and construction
Bolt performs sitework, concrete, and supporting building construction for data center projects across the Atlanta region and Southeast. We coordinate building pads, equipment foundations, underground work, and access with the teams responsible for the facility's systems.
Based in Newnan, Georgia. Serving Atlanta and communities within 200 miles.

Our construction capabilities
Data center construction brings several contractors onto the same site. Bolt's civil and structural work is planned around the foundations, utility routes, and completed areas needed for building and equipment installation. We establish those handoffs with the project team before work begins.
Campus sitework
Grading, building pads, drainage, and access for data halls, equipment yards, and future phases.
Building foundations
Concrete foundations and slabs built to the structural drawings, with underground services and embedded items coordinated before placement.
Equipment foundations
Pads and foundations for generators, transformers, and other equipment within the civil contract.
Underground connections
Drainage, grouped electrical conduits, utility crossings, and building entries planned together.
Support buildings
Metal building erection for facilities that support campus operations.
Construction access
Delivery routes, material storage, and phased completion arranged around other contractors and equipment installation.
Planning your project
Identify the civil and structural work alongside the electrical, cooling, and commissioning responsibilities. Equipment drawings, foundation details, and underground connections need to agree before construction is released.
Share the project location, construction requirements, and available drawings. We work with teams during planning and with owners and contractors preparing to build.
Contact BoltInformation to get started
- Campus plan and the buildings or phase to be constructed
- Civil and structural drawings, with available soil reports
- Equipment layouts, foundation details, and delivery dates
- Work by other contractors and required completion milestones
Regional development: 2025 reports
CBRE's March 2026 release describes Atlanta's year-end 2025 data center market. It reports 1,459.2 MW of inventory, 456 MW of annual net absorption, 2,076 MW under construction, and 2% vacancy. These figures provide historical context for regional development; a specific site's power, permitting, and construction status still need their own review.
- Under construction
- 2,076 MW
- Metro Atlanta pipeline reported in CBRE's H2 2025 review
- Total inventory
- 1,459.2 MW
- Metro Atlanta inventory at year-end 2025
- Net absorption
- 456 MW
- Metro Atlanta net absorption during 2025
- Vacancy
- 2%
- Metro Atlanta vacancy at year-end 2025
Let’s get to work
Talk with us about your data center project
Share the location, available drawings, and the civil or structural work you need completed. We can discuss the construction sequence with your team.