Newnan, GeorgiaServing the Southeast

Data Centers

Data center sitework and construction

Bolt performs sitework, concrete, and supporting building construction for data center projects across the Atlanta region and Southeast. We coordinate building pads, equipment foundations, underground work, and access with the teams responsible for the facility's systems.

Based in Newnan, Georgia. Serving Atlanta and communities within 200 miles.

Server cabinets and network cabling inside a data center

Our construction capabilities

Data center construction brings several contractors onto the same site. Bolt's civil and structural work is planned around the foundations, utility routes, and completed areas needed for building and equipment installation. We establish those handoffs with the project team before work begins.

Campus sitework

Grading, building pads, drainage, and access for data halls, equipment yards, and future phases.

Building foundations

Concrete foundations and slabs built to the structural drawings, with underground services and embedded items coordinated before placement.

Equipment foundations

Pads and foundations for generators, transformers, and other equipment within the civil contract.

Underground connections

Drainage, grouped electrical conduits, utility crossings, and building entries planned together.

Support buildings

Metal building erection for facilities that support campus operations.

Construction access

Delivery routes, material storage, and phased completion arranged around other contractors and equipment installation.

Planning your project

Identify the civil and structural work alongside the electrical, cooling, and commissioning responsibilities. Equipment drawings, foundation details, and underground connections need to agree before construction is released.

Share the project location, construction requirements, and available drawings. We work with teams during planning and with owners and contractors preparing to build.

Contact Bolt

Information to get started

  • Campus plan and the buildings or phase to be constructed
  • Civil and structural drawings, with available soil reports
  • Equipment layouts, foundation details, and delivery dates
  • Work by other contractors and required completion milestones

Regional development: 2025 reports

CBRE's March 2026 release describes Atlanta's year-end 2025 data center market. It reports 1,459.2 MW of inventory, 456 MW of annual net absorption, 2,076 MW under construction, and 2% vacancy. These figures provide historical context for regional development; a specific site's power, permitting, and construction status still need their own review.

Under construction
2,076 MW
Metro Atlanta pipeline reported in CBRE's H2 2025 review
Total inventory
1,459.2 MW
Metro Atlanta inventory at year-end 2025
Net absorption
456 MW
Metro Atlanta net absorption during 2025
Vacancy
2%
Metro Atlanta vacancy at year-end 2025

Let’s get to work

Talk with us about your data center project

Share the location, available drawings, and the civil or structural work you need completed. We can discuss the construction sequence with your team.