CORE CAPABILITY

Concrete & Foundations

Concrete and foundations are the most schedule-critical and quality-sensitive scopes on any heavy civil or industrial project. We self-perform this work with our own crews, our own equipment, and PE-engineered designs -- because the difference between a foundation that performs for 50 years and one that causes problems in 5 comes down to the team that designed and poured it.

150K+CY Concrete Capacity
CAPABILITIES

What we deliver.

Spread footings & grade beams

Conventional foundation systems for steel structures, tilt-up panels, and equipment pads. PE-designed for specific soil conditions and loading requirements.

Mat foundations

Large-area continuous foundations for heavy equipment, data halls, and process areas where differential settlement must be controlled to tight tolerances.

Pier & drilled shaft foundations

Deep foundation systems for high-load applications, poor soil conditions, or sites where shallow foundations are not feasible. Installed with our own equipment.

Slab-on-grade

Industrial-grade floor slabs with fiber reinforcement, vapor barriers, and precision finishing for flatness and levelness tolerances.

Equipment pads & pedestals

Precision-formed foundations for mechanical equipment, generators, transformers, switchgear, and process equipment with embedded anchor bolts and conduit routing.

Retaining walls

Cast-in-place, segmental, and MSE retaining wall systems for grade changes, loading dock walls, and site infrastructure.

RELATED PROJECTS

Projects in this market.

Data Center$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Manufacturing$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Industrial$500M+

Cubes at Bridgeport

Newnan

Mega industrial park at I-85 Exit 41. Amazon 1M SF tenant. Scout Cold Logistics. Approximately 6M SF of development remaining.

Tell us what you're building.

No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.