Site Development & Grading
Every project starts with dirt. Whether it's a 500-acre data center campus or a 20-acre manufacturing pad, the civil work is the critical path -- and it's the work most GCs sub out first. We don't. Our crews and our GPS-guided equipment handle mass grading, utilities, and stormwater from first cut to final grade.
What we deliver.
Mass grading & earthwork
GPS-guided fleet for precision grading on campuses spanning hundreds of acres. Cut-fill balancing, compaction testing, and final grade to spec.
Stormwater management
Detention ponds, bioswales, underground storage systems, and NPDES-compliant erosion control plans.
Underground utilities
Storm, sanitary, water, fire protection, ductbank, and direct-buried power distribution -- 200K+ LF single-project capacity.
Access roads & paving
Temporary haul roads, permanent access roads, parking lots, and heavy-duty pavement for equipment traffic.
Erosion & sediment control
NPDES compliance from first disturbed acre through final stabilization. Silt fences, check dams, inlet protection, and monitoring.
Retaining walls & slope stabilization
MSE walls, segmental retaining walls, rock slope stabilization, and geogrid reinforcement for challenging terrain.
Projects in this market.
Project Sail
Coweta County
13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.
QTS Excalibur
Fayetteville
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
T5 ATL IV
Palmetto
91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.
Rivian EV Plant
Social Circle
Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.
DC BLOX ATL
Lithia Springs
Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.
Cubes at Bridgeport
Newnan
Mega industrial park at I-85 Exit 41. Amazon 1M SF tenant. Scout Cold Logistics. Approximately 6M SF of development remaining.
Tell us what you're building.
No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.