DELIVERY METHOD

Design-Build Construction

Design-build eliminates the gap between design and construction by placing both under a single contract with one accountable team. At Bolt, that means PE-licensed engineers and self-perform crews working together from preconstruction through commissioning -- no finger-pointing, no coordination failures, no surprises. Research from the Construction Industry Institute confirms what we see in the field: design-build delivers projects 33.5% faster with 6.1% lower cost than traditional design-bid-build.

33%Faster than Traditional Delivery
CAPABILITIES

What we deliver.

Single-source accountability

One contract, one team, one standard. The firm that designs the project is the firm that builds it. No coordination gaps between architects, engineers, and contractors.

PE-stamped engineering

Licensed professional engineers develop structural calculations, foundation designs, and construction documents in-house -- integrated with field operations from day one.

Value engineering

Our engineers optimize designs for constructability before breaking ground. We identify cost savings and schedule compression opportunities during preconstruction -- not as change orders during construction.

Budget certainty

Design-build provides a guaranteed maximum price earlier in the process. Our self-perform model gives us direct cost control on 40-60% of total project value, reducing the unknowns that drive cost overruns.

Accelerated schedule

Phased design release and parallel-path construction start work months before traditional delivery. CII research documents 33.5% faster completion versus design-bid-build.

Quality control

The engineers who design the foundation are the same people who inspect the rebar and watch the pour. Self-perform construction eliminates the quality gap between design intent and field execution.

RELATED PROJECTS

Projects in this market.

Data Center$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Energy Storage$2B+

GA Power BESS

6 Sites Statewide

Largest battery storage deployment in the Southeast. 765 MW under construction. 3,000+ MW additional planned through IRP.

Manufacturing$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Tell us what you're building.

No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.