Underground Utilities
Underground utilities are the invisible backbone of every facility -- storm drainage, sanitary sewer, water distribution, fire protection, and power ductbank systems that must be installed correctly the first time, because they are buried under millions of dollars of construction.
What we deliver.
Storm drainage systems
Complete stormwater collection and conveyance including RCP, HDPE, junction boxes, headwalls, and detention/retention systems.
Sanitary sewer
Gravity sewer mains, force mains, lift stations, and manholes. PVC and DIP systems installed to jurisdictional specifications.
Water distribution
Potable water mains, fire hydrants, gate valves, and service connections. DIP and PVC systems pressure-tested and bacteriologically cleared.
Fire protection
Underground fire water supply mains, fire department connections, post indicator valves, and hydrant loops designed to NFPA standards.
Electrical conduit & ductbank
Direct-buried conduit and concrete-encased ductbank systems for medium and high-voltage power distribution.
Utility relocations
Relocation of existing utilities including gas, water, sewer, storm, telecom, and electrical.
Projects in this market.
Project Sail
Coweta County
13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.
QTS Excalibur
Fayetteville
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
T5 ATL IV
Palmetto
91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.
Rivian EV Plant
Social Circle
Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.
DC BLOX ATL
Lithia Springs
Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.
Cubes at Bridgeport
Newnan
Mega industrial park at I-85 Exit 41. Amazon 1M SF tenant. Scout Cold Logistics. Approximately 6M SF of development remaining.
Tell us what you're building.
No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.