Data Center Construction & Mission Critical Facilities
CBRE's latest year-end 2025 data shows metro Atlanta at 1,459.2 MW of inventory with 2,076 MW under construction, 456 MW of net absorption, and just 2% vacancy. Demand is not the question anymore. The hard part is power, entitlement, and field execution. Bolt is built for the civil, concrete, utilities, steel, and powered-shell scopes that decide whether a campus stays on schedule.
What we deliver.
Hyperscale campus civil/site development
Mass grading, stormwater management, and site infrastructure for campuses spanning hundreds of acres. GPS-guided fleet for precision earthwork.
Powered shell construction
Concrete tilt-up and steel frame data halls built to spec with precision tolerances for rack loading and seismic requirements.
Critical power infrastructure
Substations, switchgear buildings, generator yards, and medium-voltage distribution -- the backbone that keeps the lights on.
PE-stamped mechanical & electrical design
In-house engineering for cooling systems, power distribution, and building systems coordination from day one.
Cooling infrastructure
Chiller plants, cooling towers, piping systems, and mechanical yard construction designed for redundancy and efficiency.
Underground utilities & ductbank
Storm, sanitary, water, fire protection, and direct-buried power distribution for campus-wide connectivity.
Projects in this market.
Project Sail
Coweta County
13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.
QTS Excalibur
Fayetteville
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
T5 ATL IV
Palmetto
91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.
DC BLOX ATL
Lithia Springs
Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.
Microsoft Campus
Douglasville
Hyperscale campus at 1601 North River Road. Part of East US 3 Azure region. Phase I completion expected 2026. 160-acre parcel.
AWS Southeast
Multi-County
Multiple campuses across Butts and Douglas counties. 550+ high-skilled roles plus thousands of construction jobs. Largest corporate investment in GA history.
Request a project review.
Share the site, scope, and target start. Bolt will tell you quickly how we would approach the work.
(706) 809-0808