Data Center Construction & Mission Critical Facilities
Georgia is building more data centers than any state in the Southeast -- 63 operational, 35 under construction, 249 in the pipeline. The committed investment exceeds $100 billion, and the bottleneck isn't capital. It's crews that can move dirt, pour concrete, and erect steel at the pace these campuses demand.
What we deliver.
Hyperscale campus civil/site development
Mass grading, stormwater management, and site infrastructure for campuses spanning hundreds of acres. GPS-guided fleet for precision earthwork.
Powered shell construction
Concrete tilt-up and steel frame data halls built to spec with precision tolerances for rack loading and seismic requirements.
Critical power infrastructure
Substations, switchgear buildings, generator yards, and medium-voltage distribution -- the backbone that keeps the lights on.
PE-stamped mechanical & electrical design
In-house engineering for cooling systems, power distribution, and building systems coordination from day one.
Cooling infrastructure
Chiller plants, cooling towers, piping systems, and mechanical yard construction designed for redundancy and efficiency.
Underground utilities & ductbank
Storm, sanitary, water, fire protection, and direct-buried power distribution for campus-wide connectivity.
Projects in this market.
Project Sail
Coweta County
13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.
QTS Excalibur
Fayetteville
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
T5 ATL IV
Palmetto
91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.
DC BLOX ATL
Lithia Springs
Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.
Microsoft Campus
Douglasville
Hyperscale campus at 1601 North River Road. Part of East US 3 Azure region. Phase I completion expected 2026. 160-acre parcel.
AWS Southeast
Multi-County
Multiple campuses across Butts and Douglas counties. 550+ high-skilled roles plus thousands of construction jobs. Largest corporate investment in GA history.
Tell us what you're building.
No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.