MARKET FOCUS

Data Center Construction & Mission Critical Facilities

Georgia is building more data centers than any state in the Southeast -- 63 operational, 35 under construction, 249 in the pipeline. The committed investment exceeds $100 billion, and the bottleneck isn't capital. It's crews that can move dirt, pour concrete, and erect steel at the pace these campuses demand.

$100B+Georgia DC Pipeline
CAPABILITIES

What we deliver.

Hyperscale campus civil/site development

Mass grading, stormwater management, and site infrastructure for campuses spanning hundreds of acres. GPS-guided fleet for precision earthwork.

Powered shell construction

Concrete tilt-up and steel frame data halls built to spec with precision tolerances for rack loading and seismic requirements.

Critical power infrastructure

Substations, switchgear buildings, generator yards, and medium-voltage distribution -- the backbone that keeps the lights on.

PE-stamped mechanical & electrical design

In-house engineering for cooling systems, power distribution, and building systems coordination from day one.

Cooling infrastructure

Chiller plants, cooling towers, piping systems, and mechanical yard construction designed for redundancy and efficiency.

Underground utilities & ductbank

Storm, sanitary, water, fire protection, and direct-buried power distribution for campus-wide connectivity.

RELATED PROJECTS

Projects in this market.

Data Center$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Data Center$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Data Center$1.8B

Microsoft Campus

Douglasville

Hyperscale campus at 1601 North River Road. Part of East US 3 Azure region. Phase I completion expected 2026. 160-acre parcel.

Data Center$11B

AWS Southeast

Multi-County

Multiple campuses across Butts and Douglas counties. 550+ high-skilled roles plus thousands of construction jobs. Largest corporate investment in GA history.

Tell us what you're building.

No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.