CORE CAPABILITY

Mass Grading & Earthwork

Mass grading is the first work on every greenfield project -- and the scope that determines whether the rest of the schedule holds. On a 500-acre data center campus, the earthwork phase can involve moving millions of cubic yards of material across months of continuous operation. We self-perform this work with our own fleet of GPS-guided dozers, excavators, motor graders, and haul trucks.

500+Acres Single-Project Capacity
CAPABILITIES

What we deliver.

Mass grading

Large-scale earthwork for data center campuses, industrial sites, and solar farms. Cut/fill balancing, compaction to specification, and final grade tolerances.

Land clearing

Clearing, grubbing, and demolition for greenfield and brownfield sites. Includes tree removal, stump grinding, topsoil stripping, and disposal.

Erosion & sediment control

Georgia EPD-compliant erosion and sediment control plans, installation, and maintenance. NPDES monitoring throughout construction.

GPS-guided machine control

Trimble and Topcon GPS machine control systems on dozers, motor graders, and excavators. Precision grading to design tolerances without survey stake-chasing.

Cut/fill optimization

PE-engineered grading plans that balance earthwork quantities to minimize off-site hauling. 3D modeling and quantity takeoffs.

Stormwater management

Temporary and permanent stormwater infrastructure including detention ponds, sediment basins, outlet structures, and water quality features.

RELATED PROJECTS

Projects in this market.

Data Center$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Manufacturing$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Industrial$500M+

Cubes at Bridgeport

Newnan

Mega industrial park at I-85 Exit 41. Amazon 1M SF tenant. Scout Cold Logistics. Approximately 6M SF of development remaining.

Tell us what you're building.

No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.