Southeast US Construction

The Southeast is where America is building its next generation of infrastructure -- data centers to power AI, energy assets to power the data centers, and manufacturing facilities to power the economy. Bolt operates across six states from our Atlanta base, with the crews, equipment, and PE-licensed engineering to self-perform the critical path.

BY THE NUMBERS

Market snapshot.

6

States

Active coverage area

$150B+

Regional Pipeline

Data center + energy + industrial

30 mi

Avg. Distance

From HQ to major projects

24 hrs

Mobilization

Anywhere in the Southeast

COVERAGE

Where we operate.

We mobilize fast across six states. Our crews and equipment deploy from the Atlanta corridor to project sites across the Southeast within 24 hours.

GeorgiaHQ
Alabama
Tennessee
North Carolina
South Carolina
Florida
NEARBY PROJECTS

What's being built.

Data Center$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Energy Storage$2B+

GA Power BESS

6 Sites Statewide

Largest battery storage deployment in the Southeast. 765 MW under construction. 3,000+ MW additional planned through IRP.

Manufacturing$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.