Southeast US Construction
The Southeast is where America is building its next generation of infrastructure -- data centers to power AI, energy assets to power the data centers, and manufacturing facilities to power the economy. Bolt operates across six states from our Atlanta base, with the crews, equipment, and PE-licensed engineering to self-perform the critical path.
Market snapshot.
States
Active coverage area
Regional Pipeline
Data center + energy + industrial
Avg. Distance
From HQ to major projects
Mobilization
Anywhere in the Southeast
Where we operate.
We mobilize fast across six states. Our crews and equipment deploy from the Atlanta corridor to project sites across the Southeast within 24 hours.
What's being built.
Project Sail
Coweta County
13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.
QTS Excalibur
Fayetteville
16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.
T5 ATL IV
Palmetto
91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.
GA Power BESS
6 Sites Statewide
Largest battery storage deployment in the Southeast. 765 MW under construction. 3,000+ MW additional planned through IRP.
Rivian EV Plant
Social Circle
Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.
DC BLOX ATL
Lithia Springs
Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.
What we build here.
Tell us what you're building.
No RFP required. Describe the project and we'll get back to you within 24 hours with how we'd approach it.